2004 M-DCPS
Design Criteria – Division 15; 15-1, 15-18, 15-20
Specific Room Plumbing Requirements - Science, Art, and Photography
Labs
Gas, compressed air, or water service available to students shall be
provided with clearly labeled master emergency shut-offs.
Advantages that the Isimet Control System has over other available products or
designs
Packaged safety control system.
Sole authority to the Instructor to activate
utilities.
Emergency activated by integrated panic button
assembly.
Local emergency reset avoids classroom delays
after emergency.
Purge fan activated by emergency.
Automatic after hours shutdown.
System monitored by building alarm system.
Exhaust & fume hood fans disabled during
non-occupied periods. |